Case Study
Bellevue Youth Theater, Washington
Case Study Bellevue Y outh Theater, Washington Location: Washington Architect: Becker Architects General Contractor: Pease Construction Installing Contractor: Design Air The Bellevue (Washington) Youth Theatre’s new facility was designed to meet LEED certification standards for sustainability. The requirements for this green building project included energy efficiency, maximum indoor environmental quality, water conservation and waste reduction. These objectives were partially achieved by integrating a geothermal heating and cooling system along with The BlueDuct ® underground preinsulated duct system. Prior to installation of the underground duct system, workers from Design Air, the installing contractor, were trained and certified by Vishal Sookhai, field training specialist