Case Study

Bekomattm No-Loss Drains

Bekomattm No-Loss Drains

                        ANNUAL COST SAVINGS $25,000    ENERGY REDUCTION     Compressed Air            Case Study:                                       BEKOMAT TM                   NO-LOSS DRAINS Challenge  A customer was using 18 timer drains to remove condensate from the compressed air system on the supply side.  Timer drains use compressed air to eliminate condensate and are an inefficient method in comparison to BEKOMAT TM   no-loss drains.  

Join for free to read