Case Study

Bega Cooperative Society Economic Installation And Increased Storage Density

Bega Cooperative Society Economic Installation And Increased Storage Density

Pages 2 Pages

Bega Cooperative Society. Economic installation and increased storage density.Dexion Case Study – Bega Cooperative Society Challenge solved. A range of specialised storage racking systems in its processing and packaging complex have allowed rapid expansion of cheese manufacture, with enhanced storage overcoming the previous need to contract out cutting and packaging processes. The plant is designed to handle 35,000 tonnes of cheese or 46,

Join for free to read