Case Study

Bechtel Engineers Resilient Network for LNG Terminal

Bechtel Engineers Resilient Network for LNG Terminal

Pages 4 Pages

CASE STUDY Bechtel Engineers Resilient Network for LNG Terminal ADC Recognized for Superior Quality and Service Introduction The project objectives for the owner of one of the world’s largest liquefied natural gas (LNG) terminal were straightforward: the facility needs to be able to process 4 billion cubic feet of LNG per day, and the project needs to come in on time and on budget. To support these objectives and ensure a long service life f

Join for free to read