Case Study

Bearing piles

Bearing piles

Pages 2 Pages

St John’s Shopping Centre, Perth LOCATION REQUIREMENT TECHNIQUES MAIN CONTRACTOR St John’s Shopping Centre, Perth City Centre Bearing Piles Bottom Driven Graham Construction Limited t Case study Project Overview After providing early feasibility advice, Technik Ground Solutions Ltd (TGS) tendered and was then awarded the contract for the design and installation of the bearing piles for a new lift. The works were carried out in a stripped unit inside an operational shopping centre. Access to the working area was gai

Join for free to read