Case Study

Beacon Barracks (MoD)

Beacon Barracks (MoD)

Pages 6 Pages

THE PROJECT BEACON BARRACKS (MoD) APPLICATION DESIGN • SUPPLY • INSTALLATION MASS GRAVITY GABION RETAINING WALL (60m) LOCATION STAFFORD, STAFFORDSHIRE DATE JULY 2015 CLIENT MINISTRY OF DEFENCE ARCHITECTS HLM ARCHITECTS CONTRACTOR LEND LEASE CONSULTANT URS (GLASGOW) CASE STUDY SERIES #9PROJECT BACKGROUND Significant investment was approved in early 2015 for the Ministry of Defence site at Beacon Barracks and the surrounding area of Stafford to a

Join for free to read