BDA moved into an existing building that was heated by (27) 61.7% efficient Unit Heaters.

BDA moved into an existing building that was heated by (27) 61.7% efficient Unit Heaters.

4790 West 73 rd Street I Indianapolis, Indiana 46268 Phone: 317-290-8500 I Fax: 317-290-1900 www.aesrack.com Project Identification Customer: Bensussen Deutsch & Associates (BDA) Location: Plainfield, Indiana Design Specifications Facility Warehouse 250,000’ x 36’ High Winter Operation 70 ° – 0 ° Case Study Report Air Energy Systems, Inc. Bill Maher bmaher@aesrack.com Project Challenge: BDA moved into an existing building that was heated by (27) 61.7% efficient Unit Heaters. This system could only heat the facility to 55-0 and did not meet code. BDA wanted a new system that could maintain 70-0 in the winter, meet ASHRAE 62.1 fresh air requirement and provide summer ventilation. Equipment Solution: Air Energ