Case Study

Baxi Gets Improved Control Over Inventory And WIP

Baxi Gets Improved Control Over Inventory And WIP

SFDC Raw material holdings reduced by 14%. Completed goods increased by 37%. Baxi gets an improved and efficient supply chain for managing material moves between 3 sites. MULTI-SITE DATA CAPTURE REQUIREMENT The Baxi group needed to implement a more efficient and accurate supply chain to manage material movements across the 3 sites. This covered the entire process, from goods in at Bamber Bridge, through manufacturing and onto dispatch to on

Join for free to read