Case Study

Battery Replacement For Oil And Gas Client Minimises Offshore Maintenance

Battery Replacement For Oil And Gas Client Minimises Offshore Maintenance

CASE STUDY BATTERY REPLACEMENT FOR OIL AND GAS CLIENT MINIMISES OFFSHORE MAINTENANCE THE CLIENT BRIEF During a maintenance visit to a NUI one of the platform’s 8-year-old batteries was identified as requiring replacement (as per the battery maintenance strategy). WHY WE’RE THE PERFECT PARTNER • Successful battery replacement was achieved within a tight timescale. • Alternative battery to suit a very specific brief was sourced, charged and capacity discharge tested to meet the required shipping date. • Offshore service personnel and installation equipment were planned to align with delivery of battery. Client’s aim to minimise off-shore maintenance was fulfilled. PROJECT DELIVERY • Like-for-like battery model unavailable, so an alternative battery model, suitable to the pla

Join for free to read