Case Study

Battery production facility

Battery production facility

Pages 1 Pages

Project Description: Lenntech has engineered, manufactured and assembled a turnkey double pass reverse osmosis system with an ion exchange polishing step in Algeria. The demineralised water is used for the process of battery fabrication. The water demineralisation system is equipped with top brand instrumentation and equipment. The system is completely from European origin and will be delivered with a certificate of origin. Scope of Work: ? Engin

Join for free to read