Case Study

Barry Callebaut

Barry Callebaut

Project – Scope Client: An existing production stream required modernising to improve quality. BPE proposed a materials handling and blending equipment plant to meet the various materials physical characteristics and located this in an existing room. The new batch recipe controlled plant was designed to integrate into the existing plant. Barry Callebaut Chocolate Blending Plant • Material Balances • Options Evaluation – Product characteris

Join for free to read