Case Study

Baobab Slugging Assessment

Baobab Slugging Assessment

Pages 1 Pages

Description Five wells were shut-in due to sand problems with no immediate plans for well intervention. Hydrodynamic slugging and severe riser based slugging (SRBS) had been experienced. With anticipated declining production rates, an understanding of the optimum and undesirable flowlines’ operating conditions was required to prevent process instability caused by future slugging. The design phase transient model of the system did not predict fl

Join for free to read