Case Study
Bangor ME Installation
AquaBlok, Ltd. (419) 825-1325 services@aquablok.com www.aquablok.com AquaBlok ® Installation Profile Site Location: US EPA Region 1 Penobscot River, Bangor, ME Project Status: Completed January 2010 Setting / Purpose: Tidal River (freshwater). MGP Site – Bangor Landing is depositional area on the river in the lee of a bulkhead out-cropping. AquaBlok was used as a component of a patent-pending