Case Study

Baltimore Residential Tower: Cold Water System Rehabilitation

Baltimore Residential Tower: Cold Water System Rehabilitation

Pages 1 Pages

Location: Baltimore, Maryland Situation: An apartment building in Baltimore, Maryland, experienced yellow water coming from its cold water lines. The 15-year-old galvanized steel pipes had extensive corrosion and rust, which caused the yellow water. The pipes are hidden behind drywall and in concrete chases, making them difficult to access. Solution: Nu Flow rehabilitated more than 1,000 feet of piping without causing destruction to the building or severe disruption to the residents. Using existing access points, the corroded pipes were cleaned and then lined with Nu Flow’s epoxy barrier coating. This will prevent corrosion, rust and other failures. Where life interacts with infrastructure. North America: 1-800-834-9597 | International: 1-905-433-5510 info@nuflowtech.com | www.nu

Join for free to read