Case Study

Baltimore, MD

Baltimore, MD

Pages 1 Pages

Baltimore, MD A school district was in need of relocatable modular classroom buildings to be installed during the summer of 2017 when school was out of session. Each classroom needed to be complete with heat and AC, large windows, durable doors and and proper lighting. pre-fabricated aluminum steps and ADA ramps, on time and on and installed on site within 90 days of notice to proceed.

Join for free to read