Case Study
Balerno High School
CASE STUDY IFT was approached by Kier Construction for advice with a problem substrate that required remedial works to repair the existing paving slabs to an interior street area that was becoming a health & safety hazard. We subsequently advised Edinburgh City Council that we were able to overlay the existing substrate using a renovations screed on a suitable membrane, causing minimal disruption. As part of our integrated service, we put forward the Altro Walkway Xpresslay sheet vinyl as the final floorcovering. Due to the project being in a live school environment, the only window available was the week of the October holidays 2016. By liaising with both the client and the main contractor prior to the start on site, we were able to produce a comprehensive programme of w