Case Study

Baker Hughes PAO103 Paraf? n Inhibitor Applied in a CO2 Flood Well Lowered Treatment Cost and Increased Production

Baker Hughes PAO103 Paraf? n Inhibitor Applied in a CO2 Flood Well Lowered Treatment Cost and Increased Production

Pages 2 Pages

Results ? ? 32,190 bbl incremental production over five months ? ? USD 2,700 cost savings over conventional hot oil program Challenges ? ? Major independent producer, Texas Panhandle ? ? Paraffin problems from a recently started CO 2 flood required regular hot oil treatments ? ? Result was loss of two to three days and 1,000 bbl of oil production following each hot oiling Baker Hughes solution ? ? Wellbore cleanup treatment, including Ba

Join for free to read