Case Study

Backfill Slope And Caving Monitoring

Backfill Slope And Caving Monitoring

Pages 2 Pages

www.maptek.com CASE STUDY Leinster Nickel Operation (LNO), 645 km northeast of Perth, began production in 1979. Concentrate produced at Leinster and the nearby Mt Keith Operation is dried at Leinster and transported to the Kalgoorlie smelter. Leinster has a total underground mineral resource of 34.3 million tonnes grading 2.3 percent nickel, and 156 million tonnes open cut grading 0.6 percent nickel. The Maptek I-Site™ 3D laser imaging s

Join for free to read