Case Study
Back-Out Prevention
Back-Out Prevention UK - Offshore Issue • Production throttled by downstream processing back-pressure Solution • HP gas well provides motive to keep LP well flowing against increased manifold pressure • Boost of ~17 mmscfd from 4barg to 9 barg • Installed on cantilever extension Benefits • Allowed LP wells (10 off connected to manifold) to keep flowing • Used otherwise-wasted energy from HP field www.caltec.com