Case Study

AVEVA Bocad allowed Adani Transmission Limited to create better designs for the hundreds of difficult-to-construct towers they needed.

AVEVA Bocad allowed Adani Transmission Limited to create better designs for the hundreds of difficult-to-construct towers they needed.

Pages 2 Pages

Goals y To minimise structural stress on the towers during construction. y To develop a design using eccentric connectors to reduce the need for patches and braces. y To reduce waste and re-fabrication. Challenges y Adani Transmission had to build hundreds of towers, of four different types. y Towers had to be built with no margin for error. AVEVA Solution y AVEVA Bocad Results y Better design detailing has been achieved, allowing for an easier construction stage. y 3D modelling and rotation has made it possible to create smarter solutions. y Quick processing speeds produce drawings up to 40% faster. y Production with a precision of 0.5mm. Adani Transmission Limited www.adanitransmission.com INDUSTRY Electrical Transmission AVEVA Bocad allowed Adani Transmission Limited t

Join for free to read