Case Study

Aultman Hospital

Aultman Hospital

Pages 2 Pages

Opportunity • Large hospital in Canton, OH • 808 licensed beds, 575 active physicians in more than 40 different medical specialties and a staff of more than 5,000 employees • Was operating at an unsustainable electrical plant efficiency rate of 1.85 kW/ton Aultman Hospital Solution • Installed OptimumLOOP in two plants to deliver significant and ongoing reduction in base load and chilled water flow requirements • I

Join for free to read