Case Study
ATEX weighbridge plays important role at Gasrec’s LBM plant
ATEX weighbridge plays important role at Gasrec’s LBM plant Weightron Bilanciai have supplied a bespoke ATEX certified pit mounted weighbridge to methane reclamation specialists Gasrec for weighing gas tankers at their flagship recovery plant at Albury landfill site in Surrey. The 50 tonne, 15 metre Eurodeck weighbridge is a special 4.5 metre wide version, specially designed to allow adequate vehicle manoeuvrability at the entrance to the site. The weighbridge, which is located in a designated Zone 2 hazardous area, is fitted with Weightron’s ATEX certified CPD digital load cells. These are connected via a safe area interface box to their versatile D800 weight terminal, mounted some 50 metres from the weighbridge in the safe area. A large external digital display, located in the safe area,