Case Study
ASK Power Improves On-Time Delivery to 99% with DemandCaster
“With DemandCaster, our profit margin went from 2 to over 10 percent, our on-time performance to 99 percent, and our lead time from five to six weeks down to two to three weeks. ” Steve Kase, President and CEO ASK Power Improves On-Time Delivery to 99% with DemandCaster Case Study Supply Chain Planning About ASK Power ASK Power is an Aurora, IL-based manufacturer of electrical power connectors for the transportation, military, telecommunications, and OEM markets. With more than 50 years of tool design and applications engineering, ASK Power also provides design, development, tooling, and production for entire product lines, gauge ranges, and prototyping. Challenges and Needs: 9 The company’s ERP/MRP system worked well but couldn’t provide the flexibility of detailed capacity plann