Case Study

As-Built Documentation

As-Built Documentation

Pages 3 Pages

Laser Scanning an Ice Rink Mechanical Room for Facility Management A municipal ice rink recently contracted an engineering firm to install new cooling equipment in the mechanical room. The challenge for the engineers was to limit the downtime of the facility while replacing the old cooling unit with new piping, elements and fittings. A carefully drawn out design would have to be planned in order to successfully complete the install. As-Buil

Join for free to read