Case Study

Arrow Energy Dam 2-10 Pipeline Condition Assessment

Arrow Energy Dam 2-10 Pipeline Condition Assessment

Pages 1 Pages

Independent Pipeline Solutions Scope of Work: • Conduct a condition assessment on 2 existing above ground pipes for the potential to change their service: • DN160 SDR17 PN10 PE100 water pipe • DN280 SDR17 PN10 PE100 water pipe • Inspection of pipes at 2 locations along the line and at pumping station • Inspection of pipes in local laydown yard • Taking of sample scrapings to test at a NATA accredited Laboratory to determine U.V . Degradation

Join for free to read