Case Study

Ards Shopping Centre, Newtownards

Ards Shopping Centre, Newtownards

Project: Ards Shopping Centre Newtownards Main Contractor: Ards Shopping Centre Flooring Contractor: Larsen Contracts Ltd. Area: 600 sq.m. Products used: Larcem 55 SLC 1500 Commercial SLC 2000 Industrial SLC 1900 Base SLC 1900 Base was used to fill damaged areas of the structural slab up to 50mm. Larsen SLC 2000 Industrial, a self-levelling floor screed was selected as the fast track pump application product for th