Case Study

Archway Leisure Centre GLL North London

Archway Leisure Centre GLL North London

Pages 2 Pages

Working with Leisure Energy, GLL in partnership with Islington Council reduced their annual energy consumption at Archway Leisure Centre by 33% with a payback period of 2.8 years. A clear business case for change Leisure Energy examined the whole life cost implications of the proposed improvements from the outset. This enabled us to demonstrate a return on investment to GLL and Islington Council – modelling the capital cost of improvements against maintenance and operational costs. Our proposals showed how Archway Leisure Centre could benefit from a dramatic reduction in gas (28.2% per annum) and electricity consumption (37.6% per annum). The payback period for the capital works amounts to 2.8 years. The outcomes for Archway Leisure Centre not only include improvements to the

Join for free to read