Aramoun, Mkalles, Pins & Ras Beirut
Developing, designing and providing a full turnkey construction of 4 HV substations (220/150/66/20kV) (Aramoun, Mkalles, Pins and Ras Beirut), dedicated to feed greater Beirut area and representing a major portion of the upgrad- ing of the lebanese T&D network into 220kV. Arranging for the financing of foreign supplies (French buyer credit of $65M). Contractor SCHNEIDER ELECTRIC SA, France Subcontractor MATELEC, Lebanon as designated local subcon