Case Study

Aquatics Facility

Aquatics Facility

Pages 2 Pages

CASE STUDY AQUATICS FACILITY SEMI-CUSTOM VS. MARCRAFT TRUCUSTOM The original semi-cus- tom air handler for the new Olympic sized pool at East Irondequoit High School needed to be replaced. With a previous HVAC product life of less than 20 years, the customer knew they wanted their new HVAC system to have a longer lifespan. The original HVAC system was built into the space at the time of the overall facility construction. The new HVAC system

Join for free to read