Case Study
Appleby Gas Works, Cumbria
Appleby Gas Works, Cumbria Case Study The overall remediation strategy proposed by Envirotreat was designed to address pathway contamination issues, with the intention of protecting surface water and groundwater receptors, namely the River Eden. The remedial operation involved the installation of an Envirotreat Soil Mixed Reactive Barrier System (SMRBS) utilising proprietary E- clays