Case Study
Apache East Spar
Apache East Spar Australia Project Overview Contract Award: 1995 (Ph I) 1998 (Ph II) Sales: Singapore Fabrication: Singapore Service Base: Perth, Australia Host Type: Spar Contract Type: EPC Project Characteristics No. Trees: 2 (Ph I) 1 (Ph II) Water Depth: 100 m (330 ft) Tree Type: Horizontal Tree Pressure: 5,000 psi Tree Bore Size: 5”x2” Hydrocarbon: Gas Project Ownership Apache 55% Santos 45% Landmark: Australia’s First Spar Used on