Case Study

Apache Asbestos Removal Operation

Apache Asbestos Removal Operation

Pages 2 Pages

Apache Asbestos Removal Operation Case Study: Asbestos Removal Location: Apache- Forties Charlie Removal of Asbestos Insulation Board wall panels. Sureclean Scope Removal of Asbestos Insulation Board wall panels in Level 1 Accommodation Module - Licenced Asbestos Removal Works. 13 Personnel employed over 11 days. Technical Challenge * Offshore environment working two shifts with Modular Decontamination Unit located externally * Removal of large AIB Panels from Work Enclosure * Logistics ensuring correct equipment / consumables mobilized for this, and future phases of workscope Restrictions/Considerations * Off Duty Personnel sleeping in adjoining areas * Bed space restrictions on Platform whilst area was out of commission * Time deadline to ensure that re-fitting works schedule was not de

Join for free to read