Case Study
Anheuser Busch Fairfield, CA
Case Study: Anheuser Busch A new pasteurizer line was being installed at Anheuser Busch in Fairfield, California. Due to excellent past experience with ICO Guard 51 in the Van Nuys, California plant, Guard 51 was the preferred product for the floor of the new line by corporate engineering. ICO Guard 51 is the first product listed in the Anheuser Busch corporate flooring specification TP-70 and it has been used in their plants across