Case Study

ANGLIAN WATER TELEMETRY FRAMEWORK

ANGLIAN WATER TELEMETRY FRAMEWORK

Pages 3 Pages

For over 20 years, Dodd Group (Eastern) Ltd has been closely involved in the original installation and subsequent maintenance and replacement of telemetry systems on Anglian Waters operational sewage and potable water sites. Although the scope has changed considerably over that period  from first-time telemetry to telemetry infrastructure replacement (upgrade)  a consistent aspect has been the efficient management of multi-site projects, over 2500 sites in the last three years alone. SINGLE BOARD REPLACEMENT (SBR) The largest single element of the framework in recent years has been the planned upgrade of obsolescent outstations on smaller sites (just over 2200 sites since 2007, peaking at a rate of 400 sites per year in 2013/14). New outstation hardware is mounted on a custom backpl

Join for free to read