Case Study
Analyze: Hot Tub Routering Process
A DIVISION OF BRANDSTROM ENGINEERING ANAL YZE: HOT TUB ROUTERING PROCESS CLIENT CHALLENGE The client’s process required 120 holes and 32 ft. of breglass ashing to be manually drilled into and trimmed from the hot tub. This was a tremendously time consuming and labour intensive process marked by a number of challenges: • Employee health and safety – The nature of breglass requires all employees to be completely covered, including ful