An Impressive 16 Week Period

An Impressive 16 Week Period

This project, comprising the amalgamation of two existing laboratories to create a new Robotics Suite, was completed, commissioned and handed over within an impressive 16 week period. The existing space was stripped back to the base shell and internal walls and ceilings demolished and removed to create the new larger space. New windows & GRP doors were installed and vinyl floor finishes and wall coatings were applied. A new ventilation system was