An existing landfill facility needed developing to incorporate a novel liner system in a new 36m deep pit.

An existing landfill facility needed developing to incorporate a novel liner system in a new 36m deep pit.

London & Midlands 0207 206 2576 01788 211778 North & Scotland 01423 589500 admin@RemedyGeotechnics.com Leave the ground to us! www.remedygeotechnics.com Follow Us @RemGeotechnics Contact Remedy Geotechnics - we’ll give you an answer every time. CASE STUDY An existing landfill facility needed developing to incorporate a novel liner system in a new 36m deep pit. The novel ‘rock step’ composite liner barrier solution required advanced numerical analysis to assess the effectiveness of the proposal and ensure strain in the geomembrane liner was adequately controlled. Remedy were able to show, through a series of numerical simulations, the potential suitability of the proposed barrier configura- tion. As part of the develop