Case Study

AMS Suite: Real-Time Optimizer Saves $1.5M At INEOS Utilities Facility

AMS Suite: Real-Time Optimizer Saves $1.5M At INEOS Utilities Facility

Pages 2 Pages

POWER For more information: www.assetweb.com AMS TM Suite: Real-Time Optimizer Saves $1.5M At INEOS Utilities Facility APPLICATION Cogeneration facility producing steam and electricity for use on a chemical, oil and exploration plant. CUSTOMER INEOS Manufacturing Scotland Ltd.* - Grangemouth, Stirlingshire, UK. CHALLENGE The utilities plant produces both steam (1644 tonnes/hour) and electrical power (280 MW) that is supplied to users elsewhere on the Grangemouth site. The plant consists of 8 boilers, 7 turbo-alternators and a CHP plant that is owned and operated by a 3rd Party. There is provision for importing or exporting electricity to the grid (normally exporting when the CHP plant is running). Within the utilities plant there are effectively two main steam levels on the plant, EHP a