AMP6 Flip Pumps Programme

AMP6 Flip Pumps Programme

CASE STUDY AMP6 FLIP PUMPS PROGRAMME Falco Construction was com- missioned by Eight 2 O to carry out the installation of FLIP pumps. The objective of the programme was to prevent foul flooding of basement properties when there is a surcharge in the adjacent public sewer. The Works consisted of the construction of a FLIP pump station in the driveway, adjacent to No.4 Vale Road, Bushey. This was located within the private driveway of the property a