American Freightways Trucking Facility - Montgomery, New York

American Freightways Trucking Facility - Montgomery, New York

Pages 2 Pages

Above: The completed anchored reaction block wall/slope stabilization system provides cost-effective, permanent earth retention. Top: The three rows of anchored reaction blocks were installed as the existing slope was excavated to provide equipment access. onstruction of a trucking facility required cutting into a ridge of glacial drift. A 300,000 gallon water storage tank was located at the top of the slope. Ground conditions consisted of a