Case Study
Alternative fuels
Our energy working for you. TM > Case History Viridor Waste Management Land? ll, Scotland Where: Viridor Waste Management Land? ll, Dunbar, Scotland, U.K. What: Design and build of a 3.5 MW turnkey waste-to-energy power plant, featuring two Cummins Power Generation 1750 kW low-Btu gas generator sets, switchgear, PowerCommand ® controls, fuel treatment and a 10- year operation and maintenance agreement Purpose: To recover methane from the la