Alstom Power Limited The Customer Alstom Power Limited The Location Energy Centre and Grain Power Station. The Requirement To develop a fire safety strategy for two new gas fired power stations and conduct Fire Risk Assessment and Fire System Installation Audits. The challenge To design compliant buildings and sites while developing a dialogue with the Regulators to ensure smooth project delivery. The solution Element undertook various phased bespoke risk assessments to suit each project, with reports presented in a style to match legislative life safety requirements. Assessments covered the preliminary fire risk assessment and the construction phase to comply with the Regulatory Reform (Fire safety) Order 2005 while satisfying the requirements of the Health and Safety Executive. The resul