Case Study

Alimak Hek meet site regulations and shutdown timeframes on petro-chemical plant upgrade

Alimak Hek meet site regulations and shutdown timeframes on petro-chemical plant upgrade

Case study: Petroleum Refinery, Australia Case study: An Alimak Scando rack and pinion construction hoist was installed at the petroleum refinery for use during the shutdown, refurbishment and reconditioning of the hydrogen production unit, known as the Reformer BHU. Given the highly flammable environment of the petro-chemical plant, and the nature of the products produced, strict safety and operating conditions were

Join for free to read