Case Study

Alexander Dawson realizes safety benefits and reduces maintenance with LightEdison solution.

Alexander Dawson realizes safety benefits and reduces maintenance with LightEdison solution.

Pages 1 Pages

Alexander Dawson realizes safety benefits and reduces maintenance with LightEdison solution. Alexander Dawson School (K–8) LightEdison and Go Solar collaborate to deliver ideal turn-key LED lighting package. Challenge Alexander Dawson School is a nurturing learning environment for children in preschool through grade eight. Low light conditions existed throughout the building exterior and parking areas. The problem was exacerbated by frequent lamp failures that were causing excessive stress on the maintenance crew and operations budget in attempts to keep up with repairs. Safety concerns were prevalent with leadership not only for student safety in the winter months, but also for faculty and staff safety during evening working hours. Solution LightEdison specified and installed

Join for free to read