Case Study

Aldgate Tower

Aldgate Tower

Pages 1 Pages

www.severeld.com Aldgate Tower Location: London Client: Aldgate Developments Main Contractor: Brookeld Multiplex Engineer: Arup Architect: Wilkinson Eyre Architects Tonnage: 5,300 Completion Date: 05/12/2013 Project Overview: A steel solution has allowed the construction of an 18 storey commercial development on top of an existing raft foundation originally designed to support a smaller building. Designed to achieve a BREEAM 'Excellent' rating,

Join for free to read