Case Study
Airport Terminal Building
Airport Terminal Building Building Type: Airport Terminal Building Project Type: Retrofit Qualifying Systems: Lighting/HVAC Square Footage: 37,078 Energy Savings: 36.50% LPD Reduction: 42.90% Deduction Per Square Foot: $1.20 Total Section 179D Deduction: $44,493.60 The project designer placed HVAC and lighting retrofits in service for an airport terminal in the Southwest. Features included new split-system condensers with condensing boiler and a lighting retrofit using T8 bulbs. The installation created the energy savings of 36.5% for the HVAC system and an LPD reduction of 42.9% for the lighting system. These savings earned the full lighting and HVAC Section 179D deduction, $1.20 per square foot, for a total amount of $44,493.60. Concord Energy Strategies