Case Study

Aimteq completes BMS installation at BAE logistics centre

Aimteq completes BMS installation at BAE logistics centre

Pages 2 Pages

aimteq.co.uk Aimteq completes BMS installation at BAE logistics centre BAE SYSTEMS CASE STUDY Aimteq has completed the successful installation of a Schneider BMS (building management system) at a new £10.8 million Defence Logistics Centre for BAE Systems. The project, which was awarded to Aimteq by M&E contractor, Murray Building Services, provides easy and precise control of functions such as domestic hot water (DHW), radiant heating and the site’s cold store for the storage of carbon fibre material. BAE Systems’ new 165,000 sq ft Defence Logistics Centre sits adjacent to the company’s engineering and manufacturing facility at Samlesbury in Lancashire. Occupied and operated by logistics specialist Wincanton, the facility accommodates a 150-strong workforce. Aimteq i

Join for free to read