Afrati-Avlida 400 kV System : NKT cables completes Greece‘s first underground 400 kV transmission project

Afrati-Avlida 400 kV System : NKT cables completes Greece‘s first underground 400 kV transmission project

Pages 2 Pages

Afrati-Avlida 400 kV System The project: nkt cables completes Greece‘s first underground 400 kV transmission project nkt cables References | Afrati-Avlida 400 kV System Completing the picture • Customer: Public Power Corporation SA (PPC) • Location: Chalcis (Chalkida), Euboea, Greece (80 km from Athens) • Building time: 2010-2013 • Cable route length: approx. 13.5 km • Capacity per circuit: 1.200 A (830 MVA) • Turnkey cable project inc