Case Study

AF Switchgear Replacement

AF Switchgear Replacement

Pages 2 Pages

THE OVERVIEW: A blackout is any hospital’s greatest nightmare. After a complete blackout in 2009, the U.S. Air Force decided to make sure it wouldn’t happen again. That’s why they called Kroeschell. THE CHALLENGE: In 2009, a U.S. Air Force base, with the largest onsite hospital in the Air Force, faced a complete blackout. It was later traced back to a single point of failure. Because of the critical functions of the hospital, having another bl

Join for free to read