PROJECT: Sheraton Pool Expansion CLIENT: PCL Construction LOCATION: Red Deer, AB DATE: July 2014 HELICAL PILE SYSTEMS Aerial Access Project In July of 2014, Cyntech provided deep foundation Helical Piles as a subcontractor for PCL Construction. The project was at the Sheraton Hotel in Red Deer, Alberta. In 6 days twenty-sev- en 25’ and 31’ foot piles were installed in the courtyard of the Sheraton Hotel. The Red Deer Sheraton wanted